Remains days before the opening

Industry News

$28 Million Wind-Power-to-Hydrogen Project in Jilin Approved to Produce 20,000 Tonnes of Biomethane Annually

Release time : 2026-10-23 Source :Organizing Committee

A project to produce 20,000 tonnes of biomethane annually by combining wind-power-derived hydrogen with carbon dioxide has received filing approval, according to the Jilin Province Online Investment Project Approval and Supervision Platform.


image.png


Project details

Project code: 2610-220382-04-01-343404

Location: Shuangliao, Siping, Jilin Province, China

Total investment: RMB 200 million (approximately $28 million)

Scheduled construction start: June 2027

Scheduled completion: June 2028

 

The project will occupy a total land area of 20,000 square metres, with a planned total building floor area of 17,000 square metres.


The above-ground facilities will include office space, a control room and a protein production workshop, covering 3,000 square metres. Underground facilities, including a fire-water reservoir and pump station, will cover 1,000 square metres. The project will also include 3,000 square metres of paved roads and 10,000 square metres of equipment buildings.

The planned annual output is 20,000 tonnes of biomethane and 4,000 tonnes of biological protein. The project is expected to consume 11,000 tonnes of hydrogen and 60,000 tonnes of carbon dioxide annually.


Construction can begin only after the project completes the required procedures under national and provincial regulations, including those relating to land-use planning, energy conservation, environmental impact assessment, safety, housing and urban-rural development, water conservancy and meteorology.